Assembly of high-bay warehouse

KRASEBA Kranführer europaweit mieten

Assembly of high-bay warehouse — On this construction site, we set up a high-bay warehouse from individual modules using a Liebherr LTM 1095 5.1 with a 60m mast. The modules were pre-assembled horizontally on the ground and then placed vertically and lifted to their destination. The dimensions of the entire camp were 45m wide, 110m long and 40m high. This took 5 weeks.

en_GBEnglish (UK)